A hyperscaler often rents a data centre instead of building it. A developer, or a company set up for the one site, pays for the building. The hyperscaler pays rent for the lease term.
The hyperscaler is the borrower and the landlord is the lender. The landlord paid to build the site, and the rent pays that money back with interest.
Two kinds of lease
Finance lease
Operating lease
Term
Close to the building's full life
Shorter, often with renewal options
Accounting
Treated as buying the building with borrowed money; counts as capex
Treated as rent; still a liability, but not capex
Can the tenant leave early?
No. The payments are owed like a loan.
Yes, at the end of each term, unless a guarantee says otherwise
Both kinds start on the balance sheet only when the lease begins. A lease signed for a site still under construction sits in the footnotes until then.
Who loses if a tenant walks away
A bond gives the borrower no way out. An operating lease can: the tenant can decline to renew. Four terms in the contract decide who absorbs the loss when demand falls.
Term
What it does
Loss falls on
Long, non-cancellable term
The tenant owes rent for the full term
The hyperscaler
Short first term with renewal options
The tenant can leave at each renewal
The landlord and its lenders
Residual value guarantee
If the tenant leaves, it pays the gap between the building's value and an agreed amount
Back on the hyperscaler, up to the guaranteed amount
Parent guarantee
The parent company stands behind a subsidiary's rent
The parent, not only the subsidiary
Meta's Hyperion site in Louisiana combines two of these terms. The lease starts with a four-year term and renewals up to 20 years. Meta also gave the venture a residual value guarantee, so if it leaves early it still owes the shortfall.
Source: Meta Platforms 10-Q for the quarter ended 30 September 2026, note on leases and the data-centre ventures.
Who carries the loss, company by company
Each hyperscaler funds its data centres three ways: bonds and loans, leases already on its balance sheet, and leases signed for sites still being built. Bonds and leases on the balance sheet are owed whatever happens to AI demand.
The signed-but-not-started leases are where the contract terms decide who loses. A larger lease share moves more of a possible loss onto landlords and their lenders, but only where the terms are short or the hyperscaler can walk at renewal.
Company
Bonds and loans
Leases on the balance sheet
Signed, not yet started
Lease share
Terms that move the loss
$ billions. Lease share is all leases as a share of bonds plus all leases.
The signed-but-not-started figure is the sum of future rent, not discounted, so it is larger than the same leases will read once they start. Meta folds most finance leases into other lines, so its balance-sheet lease figure is mostly operating leases.
Source: each company's latest 10-Q, SEC EDGAR. Bonds and balance-sheet leases from XBRL; signed-not-started leases and Meta's residual value guarantees from the notes on leases and commitments.
Who carries the loss: the landlords
A landlord borrows to build a data centre and repays the loan from rent. If a large tenant leaves at renewal, the rent stops but the loan stays.
Two numbers show how hard that hits. Debt divided by a year's revenue is how many years of today's revenue the debt equals. The largest tenant's share is how much revenue one departure removes.
Landlord
Debt
Debt ÷ a year's revenue
Largest tenant's share of revenue
Who rents, and what happens if a tenant leaves
IREN and Cipher Mining used to mine bitcoin and are turning their sites into AI data centres. Most of their leases have not started yet, so their debt is large against today's revenue: the rent that pays the debt back depends on the sites opening on time.
$ billions. A year's revenue is the latest quarter times four.
Not in the table: the venture that owns Meta's Hyperion site (Beignet Investor LLC) files nothing public, so its bond price, series 3g, is the only public read on it. QTS, Vantage, Aligned and Crusoe publish no debt figures.
Source: each landlord's latest 10-Q, SEC EDGAR. Digital Realty's tenant names come from its third-quarter 2026 supplement (8-K exhibit 99.1); Applied Digital's lease terms come from its 10-K. Cipher Mining's tenant guarantee comes from its 10-Q note on leases.
Why capex above operating cash matters
Operating cash flow is the cash a business brings in from what it sells. Capex is what it spends on buildings and equipment. When capex is above 100% of operating cash, the company borrows or spends savings to cover the gap.
Microsoft, Alphabet, Amazon, Meta and Oracle together crossed that line in the quarter to September 2026: capex was 116% of operating cash, and 121% with finance leases added. A year earlier the figure was 63%. Their combined debt rose from $240B to $548B over the same year.
On the Today tab these are series 1d, 1e and 1f. A reading toward the unwind means more of the buildout runs on borrowed money.
Source: SEC EDGAR filings (XBRL), quarterly; calendar quarters, Oracle's fiscal quarters mapped to the quarter they end in.
What the Hyperion bond price tells you
The Hyperion data centre was paid for with a bond: Beignet Investor LLC, 6.581%, due 2049. Meta's rent pays the bondholders. A new bond usually sells near $100 per $100 of face value.
It now trades near $91. A lower price means lenders want more return to hold the risk that the rent stops before 2049. On the Today tab this is series 3g; a falling price reads toward the unwind.
If the bond's yield stays close to the yield on Meta's own long bonds, lenders treat the lease as being as safe as Meta's own debt. A gap that widens means lenders price in a real chance that Meta uses its way out.
The registered line is a price of 85: below it, series 3g reads stress. Series 3h, the extra yield Equinix pays over Treasuries on 10-year bonds, reads stress above +200 bp, the level where a landlord borrows like a high-yield company.
Source: FINRA TRACE prints via TradingView, daily; price only.